News
  • Can a steam turbine rotor wheel be repaired? Recently, a new client asked Howden Maintenance Partners for assistance in identifying the cause of strong vibrations in their turbine
  • Howden Maintenance Partners becomes the single service center for Howden steam turbines (including the Kuhnle, Kopp & Kausch brand) in France Howden Maintenance Partners becomes the single service center for Howden steam turbines (including the Kuhnle, Kopp & Kausch brand) in
  • Howden Maintenance Partners and RMS to cooperate on servicing of hot gas and nitric acid expanders in EMENA region BETHLEHEM, PA — 2023 — Rotating Machinery Services, Inc. today announced an alliance with Howden Maintenance Partners to service hot gas
  • Open Door Day May 19 2022 Open Door Day May 19 2022: Discover Maintenance Partners by Howden   We are pleased to invite you to our unique open door day which
  • Maintenance Partners adds new services through asset acquisition of Turbine Europe   Maintenance Partners, a business within Howden Group and a leading provider of aftermarket services for turbomachinery equipment, has
  • PRIAM project update: Testbench & Digital Forms In 2020, Howden Maintenance Partners started to participate in the PRIAM project with the partners Performance for
  • Maintenance Partners is now part of Howden We are pleased to announce that Maintenance Partners is now part of Howden (a portfolio company of KPS Capital Partners, LP
  • Watch our webinar on Centrifugal Compressor Impeller Optimization Impeller Optimization Maintenance Partners designs and manufactures impellers (open and closed) as replacement components for centrifugal
  • Turnarounds or maintenance on the horizon? Tell us in time about your plans Now that there is a light at the end of the COVID-19 tunnel, companies are preparing for turnarounds and repairs that have been postponed
  • Troubleshooting of Atlas Copco compressor at air separation plant Maintenance Partners was contacted by a customer that was not able to restart its Atlas Copco GT 078 L3K1 integrally geared compressor after
  • Timelapse: Rewinding of 2650kW high voltage electric motor Maintenance Partners recently rewound a 2650kW high voltage low speed electric motor in its Zwijndrecht workshop. After the rewinding, this
  • Video: Safe and Easy checking of belt tension using GEMEX Check the tension of belt driven applications in the safest and easiest way using Gemex! In this video we demonstrate how the belt tension
  • “PRIAM”: Project of Artificial Intelligence for Maintenance Maintenance Partners is excited to be part of “PRIAM”: Project of Artificial Intelligence for Maintenance. AI technologies dedicated to
  • Steam turbine Rotating Unbalance: Root Cause identified and solved within 5 days by MP’s experts! A customer operating a biomass fired powerplant contacted Maintenance Partners about a vibration alarm that was generated by the steam
  • Availability of Maintenance Partners’ services during the COVID-19 crisis During a crisis of these massive proportions, business is not as usual. Maintenance Partners has taken a number of measures to continue
  • COVID-19: Information for Suppliers Dear supplier, We have closely followed the evolution of the spread of the COVID-19 virus and the guidelines of the FPS public health.
  • Message to our customers relative to the COVID-19 crisis Maintenance partners is following all the guidelines that have been communicated by our government and has taken a number of extra measures
  • GEMEX belt tensioning system increases fan uptime Maintenance Partners recently carried out a conversion of an electric motor platform at a chemical plant in the Netherlands. The existing
  • Sautter-Harle Ljungström generator from 1956 ready for the future after rewinding Machines today are no longer built to last forever. Just think of a computer that lasts an average of four years and then needs to be
  • Long Term Service Agreements for Steam Turbine Generator sets A company that operates steam turbine generator sets (STG) relies on the stability of their assets to assure the continuity the plant’s
  • Välkommen Maintenance Partners Sweden AB! We are pleased to announce that Maintenance Partners Sweden AB has been established. The newest addition to the MP family is the next step
  • Alstom TM2 Steam Turbine Case: Why maintaining your machinery is the only option When a company depends on large machinery, e.g. for generating electricity, it is never safe to gamble on the health of these machines.
  • Special job: In-situ rewinding of generator aboard a vessel Rewinding… Maintenance Partners knows all about it. Every year, at least 100 electrical machines are rewound in Maintenance Partners’
  • Electric Motor Stock Sale! We currently have a number of new & unused low voltage electric motors from our stock that are available immediately. 0,06 – 4kW 920
  • Looking for a new challenge? Are you looking for a new challenge? Maintenance Partners is continuously looking for technical talent with a hands on mentality. Click one
  • Special project: Full refurbishment of 15 high voltage motors Not all motors are the same. While Maintenance Partners is a jack of many trades in terms of the repair and rewinding of motors for a wide
  • Five Questions about Rotor Inspections and Repairs The rotor is one of the most critical components of any turbomachine.  A rotor is subject to many factors that influence its
  • Meet Maintenance Partners at Euromaintenance in Antwerp on September 24-27 Meet Maintenance Partners at the Euromaintenance conference in Antwerp on September 24-27! As a sponsor and participant, Maintenance
  • Extreme re-engineering and repair of single stage steam turbine Maintenance Partners was contacted by a customer after the breakdown of a single stage steam turbine. The damage to the turbine was severe:
  • April 19 – Successful information evening with Prof. Dr. Eng. Clement Hiel: Big Data & Artificial Intelligence On April 19, Maintenance Partners had the pleasure and the unique opportunity to invite NASA engineer and professor Clement Hiel for an
  • New workwear for MP! The new workwear will be introduced in the coming weeks. Maintenance Partners wanted to change the traditional blue overalls for more modern
  • Video: Full Refurbishment of Mitsui Steam Turbine Rotor & Blade Carriers Maintenance Partners has recently completed a full refurbishment of a Mitsui steam turbine rotor and blade carriers. The video shows the
  • Get the most out of your assets Production processes continuously generate data (vibration, pressure, temperature, flow, etc.). Besides this, an enormous amount of
  • Reverse Engineering of Turbo Expander A European fertilizer manufacturer contacted Maintenance Partners to overhaul a multistage turbo expander. The expander was built in 1965
  • Full support for Alstom TM, TM2 & HTM turbines | Overhauls & Spare Parts By acquiring Leroux & Lotz Turbomachines (now MP France) in 2016, Maintenance Partners has gained years of expertise and experience on
  • Ben je op zoek naar een job? Kom naar onze jobdag op 28 juni! Sinds de management buy out in 2015 is Maintenance Partners gegroeid van 180 naar 225 werknemers. Ondertussen zijn we op zoek naar meer dan
  • Durability Improvements for Vacuum Pumps Fouling is a common problem that affects vacuum pumps, resulting in unbalance, vibrations and reduced flow. Besides this, vacuum pumps can
  • Repairs of magnetic couplers for motor driven reels Maintenance Partners offers a full solution for the inspection, repair and rewinding of magnetic couplers that are used in motor driven
  • MP switches to digital invoicing From now on we offer the possibility to receive invoices digitally. Digital invoices offer numerous advantages, including: ✅ Fast &
  • How well do you know your wind turbines? Being the owner or operator of a wind farm, regardless of the long-term contract you have, you should be able to know in what state your
  • Engineered Services: Upgrade of Damaged Gamesa G90 nose cone structures Damage was detected on the nose cone structures of 7 Gamesa G90/2000 wind turbines in a French wind farm. Instead of just repairing,
  • Interview: The Strength of Engineered Services Technological developments rapidly change the jobs of maintenance specialists. How is it possible to put all these developments to the
  • 15 MVA ELIN generator rotor fully rewound in 8 weeks time! MP’s electrical specialists have fully rewound a 15 MVA ELIN generator rotor in 8 weeks time. ELIN DTG 100/2-227 Generator from 1966
  • Borealis awards MP ‘’Diplôme d’Excellence HSE’’ for works executed during major shutdown After evaluating the major shutdown in one of its French plants, Borealis has awarded Maintenance Parthers the ‘’Diplôme d’Excellence
  • Engineered Services: Re-engineering increases Recip Compressor Lifetime Re-engineering has increased the reliability of reciprocating compressor cylinders and allowed our customer to increase production. The
  • Over 7% efficiency increase after abradable sealing modification on GHH axial/radial air compressor Maintenance Partners has recently applied an abradable sealing modification to a GHH axial/radial air compressor in combination with one
  • Maintenance, Rewinding & Complete Renewal of LDPE autoclave reactor motors In the manufacturing of LDPE (low-density polyethylene) using the autoclave process, stirrer motors (or chemical reactor vessel motors)
  • Testing of Roots Blowers and Vacuum Boosters To ensure reliable functionality after repair, Roots Blowers and High Vacuum Boosters (HVB) are tested in MP’s test facility before
  • Establishment of Maintenance Partners France S.A.S. We are proud to announce our latest expansion in France with the establishment of Maintenance Partners France S.A.S. in cooperation with
  • Inhouse Impeller Design and Manufacturing Maintenance Partners manufactures open and closed impellers (2D & 3D) as replacement components for